Nasz serwis internetowy wykorzystuje pliki 'cookies'.
Oznacza to, że mogą one być zamieszczane w Państwa urządzeniu końcowym.
W każdej chwili mogą Państwo dokonać zmiany ustawień dotyczących 'cookies' w używanym oprogramowaniu. ×
Drag the plan Drag the plan to see all ZOOM IN ZOOM OUT

1 Construction of the second passenger terminal

The performance of this task will increase the passenger capacity of the Gdansk Airport by 100%, i.e. from 2.5 to 5 million passengers (PAX) per year. The investment will contribute to the enhancement of traffic safety and will improve the passenger services.

READ more

2 Apron construction

The apron will be located between the designed passenger terminal (T2), the designed taxiing way, the existing apron (APRON 2) and the PAŻP Radiolocation Centre with an access road.

READ more

3 New Taxiway

The performance of this task will increase the operational capacity of the Gdansk Airport from 12 to 30 air operations/hour.

READ more

4 Stormwater drainage system

The area of the Airport has been divided into 7 drainage areas, including drainage areas No. 1 and 7 covered by green areas, which will not be developed. The drainage system in the drainage areas No. 2 and 5 will be constructed during the 2nd phase.

READ more

5 De-icing pad

This investment is related to the improvement of the environmental protection standard at the Gdansk Airport. The pad will comprise an apron of the area of 25,000m2 that will be located east of the existing apron (distance: 794 m) in order to provide an optimum connection of the pad with the designed taxiway

READ more

8 Noise monitoring system

Airplane manufacturers are responsible for limiting noise emitted by starting planes. It is not possible to reduce the level of noise at the Airport to the acceptable values applicable for housing developments.

READ more