Investor
Contractor
|
The modernization of the power engineering infrastructure
Investment status: finished /
Investment value: 3 988 900,00 zł
The preparatory work for the taxiway building have included the removal of collisions with the existing power engineering infrastructure and the modernization of the whole power system that feeds the Gdansk Airport.The following tasks has been done :
The transformer station building was designated for the Airport Power engineering Point.
Usable area:
In total, the usable area amount to: 188.8 m2.
|