Stormwater drainage system

Contractor / supplier:

WOD-KAN-GRZENKOWICZ Spółka z o.o.

Investment status:

Completed

Contract amount:

17 577 000 PLN net
The airport grounds have been divided into 7 catchment areas, with the exception of catchments No. 1 and No. 6, which consist of green areas and will not be included in the expansion. Meanwhile, the storm drainage system for catchments No. 2 and No. 5 will be implemented in a subsequent stage of the expansion.

PRIORITY: Priority VI: Road and air TEN-T network MEASURE: 6.3:
DEVELOPMENT OF THE TEN-T AVIATION NETWORK

Gdańsk Airport – modernization of airside infrastructure

 

Currently, stormwater drainage facilities will be implemented for catchments No. 3, No. 4, and No. 7, receiving runoff from the runway, the taxiway with exit taxiways, the existing and planned terminals with aprons and roads, and from the aircraft de-icing stand.

Catchment No. 3 covers an area of F = 119.71 ha.

The calculated runoff from this area to the sewage system is Q = 3,286.1 dm³/s. The sewage system will be equipped with:

  • A tank for collecting wastewater containing aircraft de-icing agents and rainwater runoff from the aircraft de-icing stand during the winter period, - total capacity of 7 tanks V = 280 m³;
  • A retention tank with a capacity of V = 4.800 m³, located upstream of the outlet;
  • Stormwater treatment facilities: a settling tank for mineral suspended solids and a separator for removing petroleum hydrocarbons.
Catchment No. 4 covers an area of F = 55.4 ha.

The amount of stormwater flowing into the drainage system was determined at Q = 2,519.6 dm³/s. The drainage system will be equipped with:

  • A retention tank with a capacity of V = 3.200 m³, located upstream of the outlet,
  • Stormwater treatment facilities in the form of a settling tank and a petroleum substance separator.
Catchment No. 7 (concerning the road system, the new terminal, and parking lots) covers an area of 6.7 ha.

The amount of water flowing into the drainage system is Q = 1,195.1 + 824.6 = 2,019.7 dm³/s. The drainage system will be equipped with:

  • Part 7a: A retention tank with a capacity of V = 1,173.4 m³, preceded by a settling tank and a petroleum substance separator;
  • Part 7b: A retention tank with a capacity of V = 711.4 m³, preceded by a settling tank and a petroleum substance separator.

Project "Gdańsk Airport – modernization of airside infrastructure" co-financed by the European Union from the Cohesion Fund under the Infrastructure and Environment Programme.

For infrastructure and the environment

www.mrr.gov.pl • www.mi.gov.pl • www.cupt.gov.pl

www.pois.gov.pl

Gallery

Loading...